• About us
  • Membership
  • Contact us
  • Sat December 6, 2025

  • Home
  • Society
  • Economy
  • Politics
  • Sports
  • Culture
  • International
  • Multimedia
  • Tourism

Mohammad Meshkinfam

Total:1

  • meshkin 2025-02-08 16:39

    Iran to install electronic equipment on oil tankers within 9 months

    TEHRAN – National Iranian Oil Engineering and Construction Company (NIOEC) is planning to install electronic locks and other equipment on oil tankers, with the project expected to be completed within nine months, the company’s head said.

All Pages

Latest

  • 15214

  • Iran to meet Belgium, Egypt and New Zealand: 2026 FIFA World Cup

  • Putin and Modi decry Gaza humanitarian crisis during Russian president's India visit

  • Satellite evidence reveals mass graves and incineration pits in Sudan’s El Fasher

  • Persian version of “A Country Doctor” republished

  • What’s in Tehran art galleries

  • The powerful Sahand 2025 military drills

  • Intelligence operation nets armed cell near Tehran

  • Unilateral US measures are ‘crimes against humanity’, says Tehran

  • Public back-and-forth continues between Araghchi and Lebanese counterpart

  • Iran stages second major naval drill since war with Israel

  • Iran’s steadfast stance has transformed resistance politics in West Asia: Malaysian activist

  • ‘Political statements won’t change reality’: Tehran denounces PGCC remarks on Iranian territories

  • Sahand 2025 showcases Iran's role as hub for counter-terrorism cooperation      

  • Hezbollah leader: Israel seeks to grab Lebanon under ‘Greater Israel’ scheme

Desktop version Mobile version
Top
  • About us
  • Membership
  • Contact us
  • Home
  • Society
  • Economy
  • Politics
  • Sports
  • Culture
  • International
  • Multimedia
  • Tourism

All Content by Mehr News Agency is licensed under a Creative Commons Attribution 4.0 International License.

Developed by: Nastooh Designed by: Pixel Studio