• About us
  • Membership
  • Contact us
  • Tue September 22, 2026

  • Home
  • Society
  • Economy
  • Politics
  • Sports
  • Culture
  • International
  • Multimedia
  • Tourism

Mohammad Meshkinfam

Total:1

  • meshkin 2025-02-08 16:39

    Iran to install electronic equipment on oil tankers within 9 months

    TEHRAN – National Iranian Oil Engineering and Construction Company (NIOEC) is planning to install electronic locks and other equipment on oil tankers, with the project expected to be completed within nine months, the company’s head said.

All Pages

Latest

  • 15427

  • Ground incursions, incendiary strikes mark dangerous Israeli escalation in south Lebanon

  • Impulsive German leader left in a quandary

  • Ansarallah consolidates Red Sea control as Trump rejects MBS’ desperate appeals

  • The security and economic gamble facing Iraq

  • Asghar Farhadi’s “Parallel Tales” to be shown, reviewed in Tehran

  • More than 200 days of nightmare for the US and Israel

  • Iran downs another US drone over Strait of Hormuz, brings total American drone losses to 53

  • Grand Ayatollah Shobeiri Zanjani passes away at 98; nation mourns prominent jurisprudent

  • The Saudi crisis 

  • Iran is prepared for a protracted war: IRGC

  • Iranian armed forces vow stronger response to any new aggression

  • Araghchi: Israel Hayom calls for US-Israel integration to make Washington pay for pressure on Israel

  • Iland Mega-Project Faces Prolonged Delivery

  • American Dream: Now Sold by the Gallon

Desktop version Mobile version
Top
  • About us
  • Membership
  • Contact us
  • Home
  • Society
  • Economy
  • Politics
  • Sports
  • Culture
  • International
  • Multimedia
  • Tourism

All Content by Mehr News Agency is licensed under a Creative Commons Attribution 4.0 International License.

Developed by: Nastooh Designed by: Pixel Studio